Concrete slab pour fills the void

It was a cold one, with temperatures between 34-40 degrees F. But we got the slab poured and troweled and brushed and then covered with plastic and hay for the continued cold weather. By Thursday we’ll be able to uncover it and start the next phase: framing!

img_6763img_6764img_6765img_6766img_6767

After the pour a bald eagle decided to check it out from above. I hope he wasn’t thinking, “There goes the neighborhood.”