Post-Tension Action

We have cables running across the length and width of each slab. On the 34 ft length we pulled the cable 2 5/8″. On the 16 ft width we pulled the cable 1″. The cables stay in their stretched position forever.

The strength is the equivalent of 10 cars per cable pulling at once. Finally the excess cables are cut off and the slab are ready for the structures:

   