Underground electric was installed from the new electrical pole to each building pad. Plastic tubes were placed into ditches and string was literally vacuumed through the tubes, in place of electrical cables. Once the buildings are set up and the roof is up then the electrician will return and pull cables thru all of the tubes and run them into the walls. Pretty nifty!  