Comments from the County and a Road Re-Design

It’s been an “interesting” process as I deal with “comments” and modifications from the County for both the building and septic permits.

Turns out the setbacks for the septic will require me to re-route the gravel road on the property:

new_road_setback

It might be $7-8k to fix it! Ouch.

To offset the costs I’m going to make it a 3 bedroom septic instead of a 4 bedroom and save approx $4.5k.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s